Scaffold sign (commonly known as green sign) with information about the scaffold’s qualifications. There are two versions available: either double-sided printing or an industrial variant where the back is fully equipped with extra lines for multiple inspection dates. The scaffold sign insert card can also be provided in different languages and with the company logo.
The scaffold sign (green sign) must always be mounted on a scaffold before work can commence, according to the regulations of the Swedish Work Environment Authority regarding the approval of scaffolds according to AFS 2013:3.
Our scaffold sign features a unique QR code that can be scanned to access the assembly instructions for most brands of scaffolding, e.g., Peri, +8, Haki, etc.
On the sign, you can document and see:
- Who built the scaffold
- Who the contractor is
- Date of completion
- Scaffold’s load class and implications
- Number of loaded scaffold layers
- Maximum load
- Who inspected the scaffold
The signs are packaged in sets of 50 per bag,
Recensioner
Det finns inga recensioner än.